Course Description

CourseCodeSemesterT+P (Hour)CreditECTS
CONSTRICTION METEGARE and COST-Fall Semester3+033
Course Program
Prerequisites Courses
Recommended Elective Courses
Language of CourseTurkish
Course LevelShort Cycle (Associate's Degree)
Course TypeRequired
Course CoordinatorLect. Fatma Bengü YOĞURTÇU
Name of Lecturer(s)Lect. Sevgi SIRMA
Assistant(s)
AimWith this course, it is aimed to teach the student the necessary information for the stages of quantity surveying and exploration through the construction project and manufacturing as a result of the application.
Course ContentThis course contains; Introduction of course , explainig the condition of the succes for the course, emerging the expectations of the students for construction industry through the interactive ways,Theory part; The levels of a construction Project life cycle with their scopes,Theory part; Definition, objective, importance of tender management , evaluation of a sample construction contract and master work Schedule,Theory part; Introduction to cost management(CM) , basic principles of CM and Case studies,Theory part; Introduce the correlation between design and cost through case studies ,Theory part; Introduce cost estimation models in the literature and frequently applied techniques in construction industry through case studies ,Theory part; Definition, objective, importance of procurement and value management, applying a value management technique through a sample Project data.,Bill Of Quantity (BOQ) calculations,Application part ; Preparation of a Bill Of Quantity (BOQ) table without numeric data regarding to a construction Project ( Each student will take part in the workshop) ,Application part ; Preparation of a Bill Of Quantity (BOQ) table with numeric data regarding to a construction Project ( Each student will take part in the workshop and will measure the quantity from the project),Application part ; Preparation of a Bill Of Quantity (BOQ) table with numeric data regarding to a construction Project ( Each student will take part in the workshop and will measure the quantity from the project),Application part ; Preparation of a Bill Of Quantity (BOQ) table with numeric data regarding to a construction Project ( Each student will take part in the workshop and will measure the quantity from the project),Application part ; Each student will achieve market prices from local companies for estimated cost. ,Application part ; Each student will emerge an estimated cost budget by using their calculated quantities and market prices .
Dersin Öğrenme KazanımlarıTeaching MethodsAssessment Methods
Understand the importance of cost and budget management as the industry evaluates processes with a focus on cost.10, 16, 19, 6, 9A, E
Will be able to calculate unit price types and unit prices.10, 16, 19, 6, 9A, E
Will be able to distinguish between the types of tenders used in new construction and the types of tenders used in construction projects.10, 16, 19, 6, 9A, E
Know the provisional and final acceptance procedures and what to do in case of deficiencies or defects.10, 16, 2, 9A, E
Will be able to explain the concepts of quantity and discovery.10, 16, 2, 6, 9A, E
Will be able to prepare progress payments for a project by hand or in a progress payment program using green book and attachment book information.10, 16, 2, 6, 9A, E
Teaching Methods:10: Discussion Method, 16: Question - Answer Technique, 19: Brainstorming Technique, 2: Project Based Learning Model, 6: Experiential Learning, 9: Lecture Method
Assessment Methods:A: Traditional Written Exam, E: Homework

Course Outline

OrderSubjectsPreliminary Work
1Introduction of course , explainig the condition of the succes for the course, emerging the expectations of the students for construction industry through the interactive ways
2Theory part; The levels of a construction Project life cycle with their scopes
3Theory part; Definition, objective, importance of tender management , evaluation of a sample construction contract and master work Schedule
4Theory part; Introduction to cost management(CM) , basic principles of CM and Case studies
5Theory part; Introduce the correlation between design and cost through case studies
6Theory part; Introduce cost estimation models in the literature and frequently applied techniques in construction industry through case studies
7Theory part; Definition, objective, importance of procurement and value management, applying a value management technique through a sample Project data.
8Bill Of Quantity (BOQ) calculations
9Application part ; Preparation of a Bill Of Quantity (BOQ) table without numeric data regarding to a construction Project ( Each student will take part in the workshop)
10Application part ; Preparation of a Bill Of Quantity (BOQ) table with numeric data regarding to a construction Project ( Each student will take part in the workshop and will measure the quantity from the project)
11Application part ; Preparation of a Bill Of Quantity (BOQ) table with numeric data regarding to a construction Project ( Each student will take part in the workshop and will measure the quantity from the project)
12Application part ; Preparation of a Bill Of Quantity (BOQ) table with numeric data regarding to a construction Project ( Each student will take part in the workshop and will measure the quantity from the project)
13Application part ; Each student will achieve market prices from local companies for estimated cost.
14Application part ; Each student will emerge an estimated cost budget by using their calculated quantities and market prices
Resources
Mazlum Birecikli, Yapı Metrajı Ve Maliyeti, Birsen Yayınevi, 2017
Lecture presentations

Course Contribution to Program Qualifications

Course Contribution to Program Qualifications
NoProgram QualificationContribution Level
12345
1
Offer necessary applications and solution proposals In the field of Construction Technologies.
X
2
Define adequate practical, theoretical and technical knowledge in suitable areas in the field of Construction Technology.
X
3
Use at least one CAD program for drawing architectural and static projects.
X
4
Demonstrate technical application skills in the design, repair and reinforcement of building elements.
5
Be able to recognize and select construction materials.
X
6
Aware of the necessity of life-long learning, constantly renew themselves by constantly monitoring developments in the field of Construction Technology and critically evaluate the knowledge and skills acquired.
X
7
Take an active role in the preparation and implementation phases of construction projects.
X
8
By acting in accordance with professional ethics, principles and values, become a model to colleagues and society.
X
9
Take part in researches, projects and events in cooperation with site staff and other auxiliary units with a sense of responsibility.
X
10
Use theoretical and practical knowledge in the field of Construction Technology.
X
11
Perform the necessary experiments in the fields of construction materials and soil mechanics and prepare reports of these experiments.
12
Calculate and report bill of quantities, cost and merit related to construction
X

Assessment Methods

Contribution LevelAbsolute Evaluation
Rate of Midterm Exam to Success 40
Rate of Final Exam to Success 60
Total 100
ECTS / Workload Table
ActivitiesNumber ofDuration(Hour)Total Workload(Hour)
Course Hours14342
Guided Problem Solving000
Resolution of Homework Problems and Submission as a Report11818
Term Project000
Presentation of Project / Seminar000
Quiz000
Midterm Exam11515
General Exam11515
Performance Task, Maintenance Plan000
Total Workload(Hour)90
Dersin AKTS Kredisi = Toplam İş Yükü (Saat)/30*=(90/30)3
ECTS of the course: 30 hours of work is counted as 1 ECTS credit.

Detail Informations of the Course

Course Description

CourseCodeSemesterT+P (Hour)CreditECTS
CONSTRICTION METEGARE and COST-Fall Semester3+033
Course Program
Prerequisites Courses
Recommended Elective Courses
Language of CourseTurkish
Course LevelShort Cycle (Associate's Degree)
Course TypeRequired
Course CoordinatorLect. Fatma Bengü YOĞURTÇU
Name of Lecturer(s)Lect. Sevgi SIRMA
Assistant(s)
AimWith this course, it is aimed to teach the student the necessary information for the stages of quantity surveying and exploration through the construction project and manufacturing as a result of the application.
Course ContentThis course contains; Introduction of course , explainig the condition of the succes for the course, emerging the expectations of the students for construction industry through the interactive ways,Theory part; The levels of a construction Project life cycle with their scopes,Theory part; Definition, objective, importance of tender management , evaluation of a sample construction contract and master work Schedule,Theory part; Introduction to cost management(CM) , basic principles of CM and Case studies,Theory part; Introduce the correlation between design and cost through case studies ,Theory part; Introduce cost estimation models in the literature and frequently applied techniques in construction industry through case studies ,Theory part; Definition, objective, importance of procurement and value management, applying a value management technique through a sample Project data.,Bill Of Quantity (BOQ) calculations,Application part ; Preparation of a Bill Of Quantity (BOQ) table without numeric data regarding to a construction Project ( Each student will take part in the workshop) ,Application part ; Preparation of a Bill Of Quantity (BOQ) table with numeric data regarding to a construction Project ( Each student will take part in the workshop and will measure the quantity from the project),Application part ; Preparation of a Bill Of Quantity (BOQ) table with numeric data regarding to a construction Project ( Each student will take part in the workshop and will measure the quantity from the project),Application part ; Preparation of a Bill Of Quantity (BOQ) table with numeric data regarding to a construction Project ( Each student will take part in the workshop and will measure the quantity from the project),Application part ; Each student will achieve market prices from local companies for estimated cost. ,Application part ; Each student will emerge an estimated cost budget by using their calculated quantities and market prices .
Dersin Öğrenme KazanımlarıTeaching MethodsAssessment Methods
Understand the importance of cost and budget management as the industry evaluates processes with a focus on cost.10, 16, 19, 6, 9A, E
Will be able to calculate unit price types and unit prices.10, 16, 19, 6, 9A, E
Will be able to distinguish between the types of tenders used in new construction and the types of tenders used in construction projects.10, 16, 19, 6, 9A, E
Know the provisional and final acceptance procedures and what to do in case of deficiencies or defects.10, 16, 2, 9A, E
Will be able to explain the concepts of quantity and discovery.10, 16, 2, 6, 9A, E
Will be able to prepare progress payments for a project by hand or in a progress payment program using green book and attachment book information.10, 16, 2, 6, 9A, E
Teaching Methods:10: Discussion Method, 16: Question - Answer Technique, 19: Brainstorming Technique, 2: Project Based Learning Model, 6: Experiential Learning, 9: Lecture Method
Assessment Methods:A: Traditional Written Exam, E: Homework

Course Outline

OrderSubjectsPreliminary Work
1Introduction of course , explainig the condition of the succes for the course, emerging the expectations of the students for construction industry through the interactive ways
2Theory part; The levels of a construction Project life cycle with their scopes
3Theory part; Definition, objective, importance of tender management , evaluation of a sample construction contract and master work Schedule
4Theory part; Introduction to cost management(CM) , basic principles of CM and Case studies
5Theory part; Introduce the correlation between design and cost through case studies
6Theory part; Introduce cost estimation models in the literature and frequently applied techniques in construction industry through case studies
7Theory part; Definition, objective, importance of procurement and value management, applying a value management technique through a sample Project data.
8Bill Of Quantity (BOQ) calculations
9Application part ; Preparation of a Bill Of Quantity (BOQ) table without numeric data regarding to a construction Project ( Each student will take part in the workshop)
10Application part ; Preparation of a Bill Of Quantity (BOQ) table with numeric data regarding to a construction Project ( Each student will take part in the workshop and will measure the quantity from the project)
11Application part ; Preparation of a Bill Of Quantity (BOQ) table with numeric data regarding to a construction Project ( Each student will take part in the workshop and will measure the quantity from the project)
12Application part ; Preparation of a Bill Of Quantity (BOQ) table with numeric data regarding to a construction Project ( Each student will take part in the workshop and will measure the quantity from the project)
13Application part ; Each student will achieve market prices from local companies for estimated cost.
14Application part ; Each student will emerge an estimated cost budget by using their calculated quantities and market prices
Resources
Mazlum Birecikli, Yapı Metrajı Ve Maliyeti, Birsen Yayınevi, 2017
Lecture presentations

Course Contribution to Program Qualifications

Course Contribution to Program Qualifications
NoProgram QualificationContribution Level
12345
1
Offer necessary applications and solution proposals In the field of Construction Technologies.
X
2
Define adequate practical, theoretical and technical knowledge in suitable areas in the field of Construction Technology.
X
3
Use at least one CAD program for drawing architectural and static projects.
X
4
Demonstrate technical application skills in the design, repair and reinforcement of building elements.
5
Be able to recognize and select construction materials.
X
6
Aware of the necessity of life-long learning, constantly renew themselves by constantly monitoring developments in the field of Construction Technology and critically evaluate the knowledge and skills acquired.
X
7
Take an active role in the preparation and implementation phases of construction projects.
X
8
By acting in accordance with professional ethics, principles and values, become a model to colleagues and society.
X
9
Take part in researches, projects and events in cooperation with site staff and other auxiliary units with a sense of responsibility.
X
10
Use theoretical and practical knowledge in the field of Construction Technology.
X
11
Perform the necessary experiments in the fields of construction materials and soil mechanics and prepare reports of these experiments.
12
Calculate and report bill of quantities, cost and merit related to construction
X

Assessment Methods

Contribution LevelAbsolute Evaluation
Rate of Midterm Exam to Success 40
Rate of Final Exam to Success 60
Total 100

Numerical Data

Student Success

Ekleme Tarihi: 06/11/2023 - 14:23Son Güncelleme Tarihi: 06/11/2023 - 14:23